UNDERGROUND STORAGE TANKS SPECIFIC ACTION PERMIT FEES
Fees for Special Services are $216/hour Effective July 1, 2017, L.A.M.C. 57.105.7.8.4
 

                                    UST Specific Action Permit Fees

 
Tank Installation: Plan Check, Inspection, Soil Report Review$2592
12 hr. minimum*
Tank Abandonment by Removal: Plan Check, Inspection, Soil Report Review$1944
9 hr. minimum*

$648 for each addt'l tank
3 hr. minimum
Tank Abandonment-in-Place: Plan Check, Inspection, Soil Report Review$1944
9 hr. minimum*

$648 for each addt'l tank
3 hr. minimum
Tank System Major Modifications, Add or Alter: Plan Check, Inspection, Soil Report$2592
12 hr. minimum*
Tank Entry Relining Repairs: Plan Check, Inspection, Soil Report$1296
6 hr. minimum*
Tank System Minor Modification or Repair: Plan Check, Inspection$648
3 hr. minimum*
Tank System Minor Repair Performed During Routine Inspection$216
1 hr. minimum*
Soil Report Review : Business Initiated Reports or Business Requests for No Further Action (Inspector Review of File)$2592
12 hr. minimum*
Expedite Plan Check or Site Assessment: In addition to Specific D5 Permit$420
4 hr. minimum**
Addition to original
permit
Contractor Changes, Additional Plan Check (LAMC 57.105.7.8.2) $216
1 hr. minimum*

* If additional time is required for Fire Department processing, the responsible party will be billed
at the current hourly rate in effect.

 